Apr. 20th, 2015

alexpgp: (Visa)
After polishing off the translation that arrived Friday, I finished installing the carpet in my office, which basically cleared the way for me to move all of my crap valuable work materials back into the room. In between, I was interrupted by a high-priority (but short) item.

I did not get as far as I wanted to. The major pieces of furniture have been moved, but the computers, etc. still need to be connected to power and each other, as required.

Tomorrow, I guess... :)

Profile

alexpgp: (Default)
alexpgp

January 2018

S M T W T F S
  1 2 3456
7 8910111213
14 15 16 17181920
21222324252627
28293031   

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 11th, 2025 02:42 pm
Powered by Dreamwidth Studios